ITS Axir – Consultancy and Integration

Conseil general val de marne
logo electricite de france
logo groupama
logo ISC PARIS, School of Management
logo ministry of defense
logo mediametrie
logo reseau transport electricite
logo veolia environment
logo Veolia proprete
logo Yves Saint Laurent
Conseil general val de marne

CG 94

Provision of a group of experts in IT infrastructure

Technology: Oracle/MySQL/SQL Server/Red Hat Enterprise/Windows Server/VMWare/SAN EMC2.

logo electricite de france

EDF

Outsourcing of packaging and deployment of administrative solutions

Equipment: around 2000 servers - around 200 applications.

logo groupama

Groupama

Implementation of a Metrology Network within Infovista environment

Service development

  • Phase 1: Prototyping;
  • Phase 2: Launch and specification of indicators;
  • Phase 3: Solution Customisation;
  • Phase 4: Skills transfer.

logo ISC PARIS, School of Management

ISC PARIS, School of Management

Virtualisation of 150 workstations

Environment: VMWare/Active director/Windows 200/Baie Net App.

Context:
The ISC business school wanted to update its equipment to address security, administration, availability and flexibility issues.
ITS Axir supported ISC throughout every stage of this project from identifying needs to producing solutions.

logo ministry of defense

Ministry of Defence

Technical expertise on UNIX/SAN for updating a material platform supporting a business application

  • Installation and configuration of UNIXWARE/SAN HP EVA bays servers;
  • Deployment of inter-sites High Availability;
  • Deployment of backup tools and resources;
  • Documentation, skills transfer and training.

logo mediametrie

Médiamétrie

Consultancy in Architecture

Environment: VMWare Novell NetWare/Unix/Net App/Cisco/Cheyenne/3com.

Service continuity and IT system scalability services:

  • Consultancy in Technical Architecture;
  • Technical studies concerning system scalability and specification;
  • Maintenance of Technical Architecture;
  • Operational assistance.

logo reseau transport electricite

RTE

Secured Architecture

  • Environment: Microsoft Windows NT, 2000/Unix/ORACLE/Open view/Landesk;
  • Assistance and technical expertise for secured architecture devices;
  • Secured access to the tool integration platform.

logo veolia environment

Veolia Environnement

VECTOR Infrastructure technical validation

Environment: Windows/Microsoft SQL Server.

Veolia is going to build the VECTOR.mig project  in its Data Centers.

ITS Axir teams proceeded as follows:

  • Phase 1: Evaluation;
  • Phase 2: Design;
  • Phase 3: Implementation.

logo Veolia proprete

Veolia Propreté

VP online deployment and application management of HORUS supervision

  • Environment: ESX, Virtual Infrastructure 3/VMWare Server/DELL/Linux Ubuntu servers;
  • Volumetry: 15 servers;
  • Goals: Solution deployment and integration within the application management process of the supervision platform.

ITS Axir works in the following way:

  • Phase 1: Installation of supervision servers;
  • Phase 2: Deployment and qualification of scope;
  • Phase 3: Configuration of HORUS;
  • Phase 4: Launch of la TMA.

logo Yves Saint Laurent

Yves Saint Laurent

Industrialisation of IT infrastructures;

Environment: VMWare ESX/Platespin/Vizioncore/Windows.

Deployment of a dedicated virtual infrastructure:

  • Eligibility studies;
  • Modelling, Management;
  • P to V Virtualisation;
  • Skills transfer.